California PATH Task Order 4304
Title: PATH
PARAMICS development and support
Researcher: Mike McNally, Lianyu Chu, Jun-Seok Oh, Henry Liu
Time:
2002.10
2004.6
Project status: On-going
Project Summary:
The objective of this project is to provide Caltrans with
PARAMICS-related assistance in three broad categories, on-call API support, technical
guidance, and research related support.
Project Description:
The detailed tasks in this project are explained as follows:
Task 1 On-call API support
1.1 Support Caltrans user inquiries on currently implemented
UCI-developed APIs.
1.2 API Maintenance, Enhancement, and Development.
1.3 Due to the requirement of I-10 freeway ramp
metering evaluation project, the research team was asked to implement SWARM ramp-metering algorithm in PARAMICS based on the
source code from Caltrans.
Task 2 Technical guidance on Micro-simulation
2.1 Micro-simulation Modeling Guidance and Evaluation
2.2 Peer Review of Caltrans Microsimulation Model Guidelines
Task 3 Research Related Support
3.1 The Interface Between the 4-step Model and Traffic
Microsimulation Models. The following integration issues will be reviewed: (1) Network Data Structure; (2)
3.2 Evaluation of Validation/Calibration
Techniques for Microsimulation